Pre-construction & constructibility
Drawing/spec review, MEP and structural coordination, estimating, VE, GMP/bid packages. Built Shopify’s pre-con from zero; lead estimator at Kiewit, $3M–$1.5B pursuits.
Owner-side construction leader behind Shopify’s $500M / 1.9M sf workplace portfolio — full-building offices, commercial kitchens, executive and event spaces, AV and acoustics, server and IDF rooms, and the power, cooling, and security infrastructure underneath. I came up in the field reading drawings at Kiewit, and I build the delivery systems and teams that ship complex work at speed.
Drawing/spec review, MEP and structural coordination, estimating, VE, GMP/bid packages. Built Shopify’s pre-con from zero; lead estimator at Kiewit, $3M–$1.5B pursuits.
Commercial kitchens (Type I hoods, 30,000+ CFM, MUA, UL300), AV/acoustics, server/IDF, redundant power, supplemental cooling, elevated power density, integrated security.
Pre-qual/RFQ, RFP/ITB, bid leveling, scope normalization, contract structure across GMP, lump-sum, CM-at-risk, and design-assist; long-lead vendor management.
Budgets by division, SOV, pay-app review, contingency/allowance, forecast-to-complete, PCO-to-CO — with reporting leadership and the board steered on.
Systems commissioning, TCO/CO, as-builts, O&M, warranties, owner training; MUA balancing, BMS, life-safety, run to handover across concurrent projects.
Built and scaled Shopify’s PM team and PMP-compliant governance through 400% growth: standards, playbooks, project controls, the operating system behind execution.
I started on jobsites, not in boardrooms. At Kiewit I field-engineered a $40M hydroelectric powerhouse and a $46M New York City bascule bridge — reading structural and MEP drawings, resolving conflicts in the field, holding subs and specs to account. That’s why at Shopify I could build a capital-delivery function from zero and run its most technically complex workplaces end to end. I lead construction the way I learned it: from the drawing set up.

Flagship campus, led pre-construction through design: a 25,000 sf commercial kitchen, restaurants and bars, event and community programming. Programming, Class estimates, RFP, GC selection, contracts.

Took over an at-risk fit-out in an occupied 15-story tower — rebuilt scope, budget, schedule, and governance, realigned executives, delivered under budget and on schedule. Full commercial kitchen within the stack.
Delivered TI and design of a hyperscale facility: high-tech equipment, technical infrastructure and MEP, costing, vendor negotiations.
Lead estimator and field engineer on heavy civil: a $40M hydroelectric powerhouse and a $46M New York City bascule bridge. Estimating from $3M to $1.5B, means-and-methods, field-conflict resolution, reconciling scope against architectural, structural, and MEP drawings. Where I learned to read a drawing set and hold a contractor to it.
Advised Fortune 500 clients on workplace strategy and design-build delivery across North America and international markets, including LEED-certified workplaces.
Leading real estate strategy and delivery for an AI-robotics platform across North America, LATAM, and APAC — feasibility, permitting, AHJ coordination, and site readiness across 45+ sites.







